How Long Do Car Accident Repairs Take in the UK?

Introduction

After a crash, most drivers ask the same question: “How long will it take to get my car repaired?
Repair times in the UK vary widely. The damage type, parts availability, insurer approvals, and repair-shop capacity all affect the timeline. At Nova Motor Assist, we manage every stage of the repair process to minimise delays and keep you moving with a like-for-like replacement car.

How long do car accident repairs take in the UK? Minor repairs can take 3–7 days, while complex bodywork or structural repairs may take 2–6 weeks. Parts shortages, insurer delays, and repair-shop workloads can extend this. Nova Motor Assist speeds up approvals and ensures quality repairs through trusted UK garages.

How Long Do Car Accident Repairs Usually Take in the UK?

On average:

  • Minor repairs (scratches, small dents): 3–7 days
  • Moderate repairs (panels, bumpers, paintwork): 1–3 weeks
  • Major repairs (structural damage, airbags, engine): 3–6 weeks
  • Severe cases (total loss evaluation): 6–8+ weeks

👉 These times are typical but can change depending on your insurer, the repair garage, and the parts required.

What Factors Affect Repair Times?

1. Damage Severity

A light scratch or bumper scuff takes days. A bent frame or airbag deployment can take weeks.

2. Parts Availability

If the garage needs manufacturer-approved parts, shortages can delay work (common for EVs or less common models).

3. Insurer Approvals

Insurers must approve repair costs. Without active management, this can add several days or weeks.

4. Repair Shop Capacity

Busy garages may queue jobs, especially after winter crashes or bad weather when accidents spike.

5. Specialist Work

Paint-matching, electrical systems, and ADAS recalibration often extend timelines.

How Nova Motor Assist Speeds Up Repairs

  • Fast FNOL reporting to log your accident immediately.
  • Recovery & storage arranged within hours.
  • Replacement vehicle delivered so you can keep moving.
  • Trusted UK repair network that works to manufacturer standards.
  • Active claim handling with insurers to prevent approval delays.

How to Reduce Delays in Car Repairs

  • Report the accident quickly (FNOL).
  • Provide all claim documents immediately.
  • Use an accident management company to liaise with insurers.
  • Choose a repairer with manufacturer approval.
  • Keep communication open with your repair manager.

FAQs: How Long Do Car Accident Repairs Take in the UK?

1. What is the average car repair time after an accident?

Minor repairs take 3–7 days, while major accident repairs may take 3–6 weeks depending on damage and parts availability.

2. Why do repairs take so long?

Delays usually come from insurer approvals, waiting for specialist parts, or high demand at garages.

3. Can I get a replacement car while mine is repaired?

Yes. Nova Motor Assist provides like-for-like replacement vehicles on credit hire for non-fault drivers.

4. What if my car is written off?

If repairs cost more than the car’s value, the insurer declares a total loss. Settlements usually take 2–4 weeks.

How can Nova Motor Assist help?

We speed up the process by handling claims, arranging repairs through trusted garages, and keeping you driving with a replacement vehicle.

Conclusion

Car accident repair times in the UK vary from a few days to several weeks depending on the damage, parts, and insurer processes. By working with Nova Motor Assist, you avoid long delays, get a like-for-like replacement vehicle, and benefit from faster, stress-free repairs.

👉 Let us handle the process — you focus on getting back on the road.


    Leave a Reply

    Your email address will not be published. Required fields are marked *